Closure of the Fast Flux Test Facility: History, Status, Future Plans.
(30/05/2013)
In 1993, the US Department of Energy (DOE) decided to shut down the Fast Flux Test Facility (FFTF) due to lack of national missions that justified the annual operating budget of approximately $88M/year. The initial vision was to 'deactivate' the facility to an industrially and radiologically safe condition to allow long-term, minimal surveillance storage until approximately 2045. This approach would minimize near term cash flow and allow the radioactive decay of activated components. The final decontamination and decommissioning (D and D) would then be performed using then-current methodology in a safe and efficient manner. The philosophy has now changed to...
Tác giả: Farabee, O. A.; Church, W. R. |
Số trang: 10 |
Lĩnh vực: Năng lượng |
Năm XB: 2006 |
Loại tài liệu: Khác
Tài liệu cần xác thực trước khi tải
Tiêu đề | Tải về |
| Số trang:
| Loại file:
|
miễn phí
|
© Copyright 2012 Trung tâm Thông tin Khoa học và Công nghệ - Sở Khoa học & Công nghệ TP. Cần Thơ
Địa chỉ: 118/3 Trần Phú - P.Cái Khế - Q.Ninh Kiều - TPCT
Điện thoại: 0292 3824031 Fax: 0292 3812352
|
|
Lượt truy cập:
(Website trong thời gian thử nghiệm)